03/29/01

ZOO PREDITOR CONTAINMENT BUILDING
CONSTRUCTION DOCUMENT
Project Area
1930 Square Feet

94  1707

 



CSI

Description

Total $

Percent

Cost/SF

01

General Requirements

65,351

12.38%

33.86

02

Site Work

5,300

1.00%

2.75

03

Concrete

18,493

3.50%

9.58

04

Masonry

83,781

15.87%

43.41

05

Metals

12,195

2.31%

6.32

06

Wood & Plastics

40,783

7.73%

21.13

07

Moisture-Thermal Control

16,588

3.14%

8.60

08

Doors, Windows & Glass

157,253

29.79%

81.48

09

Finishes

6,976

1.32%

3.61

10

Specialties

948

0.18%

0.49

11

Equipment

250

0.05%

0.13

15

Mechanical

65,662

12.44%

34.02

16

Electrical

54,281

10.28%

28.12

 

Job total

 

$527,863

100.00%

$273.50

 

Profit

10%

$52,786

 

 

 

Bond

1%

$5,279

 

 

 

Contingency

5%

$26,393

 

 

 

Grand Total

 

$612,321

 

$317.26

*Back